Type: | Wire Strippers |
---|---|
Certification: | RoHS |
Customized: | Non-Customized |
Condition: | New |
Feature: | Insulation |
Length: | 136 (L) X 46 (D) X 41.5 (H) mm |
Customization: |
---|
Suppliers with verified business licenses
The TFS10 thermal Jacket Remover is rugged and durable, yet small in size and light weight.
Designed to strip the jacket of single fiber and ribbon cable up to 12 fibers (fiber holders sold separately), The TFS-10 provides superior ribbon and field-ribbonized stripping performance. easy to use that anyone can do clear stripping with near zero failure.
Specification:
Coating stripped length |
Up to 30mm |
Heating mode |
Normal mode |
Power saving mode |
|
Temperature setting |
This machine is equipped with 60 ° C, 80 ° C, 100 ° C, and 120 °C Fourth gear |
Fiber fixing method |
Using the FH-1, FH-2 FH-4 and FH-8, FH-12 fixture |
Power supply mode |
DC12V 2A adapter |
Dimensions |
136 (L) X 46 (D) X 41.5 (H) mm |
Weight |
320g |
Environmental requirements |
Temperature 0-40 ° C temperature is below 85% |
FEATURES:
Very usefully device to strip coated fiber up to 16 cores
1, 4, 8, 12 and 16 fiber capacity
Four temperature modes: 158 to 266 °F (70 to 130 °C)
High Performance Stripping Structure
Dual modes for operation: end-stripping or mid-span(window) stripping
No Fiber Scratch/Crack after stripping, High Strip-Quality
Methods of operation
1,Connect the power adapter to both ends of the AC220V power and thermal stripping Power Interface
2,The optical fiber length according to user needs into the fixture stripping
3,The fixture will be installed into the fixture fiber mat
4,Open hot stripping power supply, that is press the power button for about 1 second until the power indicator light 5,Transferred to the temperature key file 2 or 3 files
6,The hot pressed fiber stripping device cover and turn left cover cover
7,Wait for the heat indicator that turns green to reach the preset temperature
8,Stripping fiber: Hold down the right hand part, left part of the uniform force will pull to the left; Special note: When a window needs to be done stripping, the part can not pull the clamp left in place, should remain 3-5mm coating layer is connected with fiber.
9, Left cover, followed by pressure-fiber cover open, remove the fixture and with the fiber, please do not forget to note that after stripping out each strip of the coating layer;
10,Use a purity of more than 99% alcohol soaked gauze clean fiber.
3V TECH was approved and registered by the Chinese Ministry of Commerce in 2011, located in Yangtze River Delta-Suzhou City, which is a famous land of milk and honey nearby Taihu Lake,and 1 hour briving to Shanghai
Suppliers with verified business licenses